+1 (888) 610-2872Support
AURONA
A data center aisle between rows of enclosed server cabinets above a raised floor.

Industries

Data Centers & AI Infrastructure

Power distribution, conductive materials and cooling requirements for compute infrastructure.

The application

Requirements shaped by your project.

A data-center package connects incoming power, distribution to the load and the thermal systems around it. Bring the single-line diagram, equipment schedules and installation constraints so transformer, switchgear, busway, conductor and cooling inquiries can be reviewed as a coordinated package. Identify facility standards, approved-source restrictions, project phases and required submittals. Aurona reviews sourcing and commercial requirements line by line; redundancy design, electrical coordination, thermal performance and commissioning stay with the responsible project teams.

Typical project requirements

  • Incoming power and transformer requirements
  • Switchgear, busway and distribution assemblies
  • Grounding, bonding and conductor packages
  • Cooling equipment and facility interfaces

Application examples provide context. Each sourcing request is reviewed against its own specification.

Relevant product families

Start with the equipment and material package.

Request a quote

Send the project requirement.

Send your specification, quantity and required date. Aurona will review the requirement and confirm whether a qualified sourcing route is available.

RFQ, BOM or drawing.
Your original requirement stays intact.

Pricing, lead time and documentation are subject to human review and a formal quote.

Your sourcing requirement

* Required
Contact and product requirement

PDF, XLSX, CSV, DOCX, JPG, PNG, WebP · 20 MB each · up to 5 files

A request for review. No purchase commitment.
Call SalesRequest a Quote

Ask Aurona

AI assistant

How can we help?

I’m Aurona’s AI assistant. I can help with products, applications and sourcing questions.

0/2000 characters

Need help getting started?