+1 (888) 610-2872Support
AURONA
High-voltage transformer with insulating bushings in an electrical substation.

Industries

Power Infrastructure

Equipment and material requirements for generation, storage and electrification projects.

The application

Requirements shaped by your project.

Power projects bring electrical equipment, interconnections and material packages into one delivery program. Share the project requirements, single-line diagram and equipment or material schedules, with a clear boundary between supplied items and site work. Aurona reviews manufacturing and supply options and documentation against the stated requirements for generation, storage or electrification infrastructure. This sourcing service does not establish battery-system, plant-design or commissioning capability. Technical acceptance and any alternative equipment selection require the project’s qualified approval.

Typical project requirements

  • Generation and storage project distribution
  • Transformer and switchgear inquiries
  • Electrification equipment packages
  • Conductive, structural and grounding material requirements

Application examples provide context. Each sourcing request is reviewed against its own specification.

Relevant product families

Start with the equipment and material package.

Request a quote

Send the project requirement.

Send your specification, quantity and required date. Aurona will review the requirement and confirm whether a qualified sourcing route is available.

RFQ, BOM or drawing.
Your original requirement stays intact.

Pricing, lead time and documentation are subject to human review and a formal quote.

Your sourcing requirement

* Required
Contact and product requirement

PDF, XLSX, CSV, DOCX, JPG, PNG, WebP · 20 MB each · up to 5 files

A request for review. No purchase commitment.
Call SalesRequest a Quote

Ask Aurona

AI assistant

How can we help?

I’m Aurona’s AI assistant. I can help with products, applications and sourcing questions.

0/2000 characters

Need help getting started?