+1 (888) 610-2872Support
AURONA
AI-generated architectural cutaway of a data hall with server cabinets, adjacent electrical switchgear and a transformer.

AURONA SOFTWARE

Kenta

Plan, manage and deliver critical power infrastructure.

Power infrastructure and project intelligence software connecting capacity planning, project execution, equipment records and technical reviews for energy and data center teams.

Power Infrastructure & Project Intelligence

Understand what needs attention next.

Fragmented project information makes it difficult to see what power capacity is needed, which technical decisions are ready and what remains unresolved. Bring capacity assumptions, equipment records, reviews and delivery stages into one project context.

Kenta is Aurona’s software offering for infrastructure teams, separate from its equipment and materials supply services.

Explore Kenta

See an equipment review in Kenta.

Follow SWG-01 from document comparison to supplier clarification. Explore the source evidence, reviewer decision and assigned follow-up in this sample project.

KentaSWG-01 · Switchgear document review

Start with the equipment documents.

E-101 Revision C and OC-204 Revision B are uploaded as PDFs. Equipment fields are manually verified against page 1 before comparison.

Kenta Documents view showing the sample E-101 Revision C equipment schedule and OC-204 Revision B order confirmation.Open full-size screenshot

Engineering authority remains with qualified people. Kenta does not certify capacity, approve substitutions or authorize energization.

Working application · Synthetic sample projectActual screens; no customer data.

From capacity assumptions to project action.

Review the planning basis, track outstanding work and retain the evidence behind equipment and delivery decisions.

  • Power Planning

    Record requirements and review assumptions.

    Record load requirements, capacity limits and source evidence. Track review status and compare reviewed real-power totals with a reviewed limit; unsupported inputs remain unknown.

  • Actions & Delivery Stages

    See what delivery depends on.

    Assign owners and target dates. Link actions and required stages to identify unresolved work that prevents a stage from being marked complete.

  • Equipment Records

    Keep equipment information together.

    Manage specifications, suppliers, owners and recorded delivery dates alongside source documents and change history.

  • Document Comparison

    Identify differences for review.

    Compare equipment fields across document versions and inspect the cited page or cell. Missing or ambiguous values remain visible.

  • Review Decisions

    Document the decision.

    Record the reviewer’s decision and supporting rationale, with source evidence and review history retained.

  • Project Reports

    Share the review record.

    Export equipment information, source references, review decisions and outstanding actions as CSV or PDF reports.

Document evidence and accountable project action

Document intelligence

See the source behind each difference.

Schedule E-101 is at Revision C; confirmation OC-204 references Revision B. Both specify 480 V and 3200 A. Kenta identifies a possible revision mismatch for review.

The reviewer verifies the PDF fields against the original pages and determines what needs clarification. A revision difference alone does not establish a technical conflict.

Inspect the SWG-01 evidence
Synthetic example · Source excerpts

Project requirement

Equipment schedule

Revision C

E-101 · Page 1

Applicable equipment schedule: E-101, Revision C.
Equipment
SWG-01
Recorded requirement
480 V · 3200 A

Supplier record

Order confirmation

References Revision B

OC-204 · Page 1

Equipment schedule referenced: E-101, Revision B.
Equipment
SWG-01
Confirmed rating
480 V · 3200 A

Possible revision mismatch · Human review required

Project accountability

Record the decision. Assign the follow-up.

The reviewer requests supplier clarification, assigns an owner and links the action to Procurement release.

Source references, the review decision and its rationale remain available as the team resolves the open action.

View the decision and follow-up
Synthetic example · Decision and follow-up

Example · Switchgear package

Confirm the applicable revision

Human review
  1. Decision · Clarification required

    E-101 Revision C / OC-204 references Revision B

  2. Action · Obtain supplier confirmation

    Procurement owner requests confirmation against Revision C.

  3. Delivery stage · Procurement release

    The linked action remains open until the clarification is resolved.

Focused on the infrastructure that powers modern life.

Capacity planning, equipment review and project coordination for energy systems and data centers.

AI-generated illustration of a modern data-center aisle with dark server cabinets, overhead cable trays and a raised floor.

Data centers

Resolve switchgear revision questions.

Review switchgear requirements, resolve supplier clarifications and assign follow-up to the responsible team and delivery stage.

See the switchgear review
High-voltage switchyard equipment, insulators and bus conductors at an electrical substation.

Energy infrastructure

Review equipment and power assumptions.

Review transformer and switchgear records as specifications change. Record power assumptions and compare reviewed inputs with a reviewed limit for planning discussions.

Review supported files and limits

Technical details for your evaluation.

Evaluate Kenta against your project requirements.

Review the supported files, access controls and data-handling requirements with your team. Evaluation scope, setup assistance and customer-data use are agreed individually.

Files are uploaded manually. Native CAD, BIM and ERP integrations are not available. Engineering review remains with qualified professionals.

Files, imports and exports
PDF, UTF-8 CSV and macro-free XLSX: up to 20 MiB per file and 250 pages per PDF. Equipment imports support up to 1,000 records. Export reports as CSV or PDF, with up to 500 records per PDF report. Scans require manual review; OCR is unavailable.
Evaluation hosting and access
Organization and project roles control access to records, reviews and administration. Hosting, sign-in and data-handling arrangements are confirmed for each evaluation. SAML and SCIM are not available.
Review records and AI data use
Comparisons retain document versions, page or cell references and uncertainty. Decisions retain the reviewer and rationale. Checks use fixed rules; this document-review process does not send file contents to an AI model.
Retention and deletion
Terms are agreed before customer files are accepted. Holds and deletion requests are recorded. Deletion requires administrator review and operator execution; automatic deletion is not enabled.

Your Kenta demonstration.

What to expect

A focused walkthrough for your team.

Tell us about your team and project. Aurona will follow up to arrange a sample-project demonstration and discuss your planning and delivery needs. You do not need to share confidential documents.

Request a Demo
  1. What we show

    Recorded capacity assumptions, delivery stages and a switchgear review: source evidence, a reviewer decision and an assigned action, with report export.

  2. What we confirm

    Supported files, review responsibilities and how Kenta fits your project requirements.

  3. What follows

    An agreed evaluation scope, including access, data handling and setup assistance, before customer documents are used.

Questions about Kenta

Who is Kenta for?

Kenta is for energy and data center teams coordinating power requirements, equipment records and technical decisions. Planners record and review capacity assumptions; engineering and procurement teams resolve document questions; project teams assign actions and track delivery stages.

What does Power Planning calculate?

It totals reviewed real-power inputs in W, kW or MW and compares them with a reviewed limit. Sources, assumptions and review decisions remain visible. This is an arithmetic check, not electrical-network simulation, usable-capacity certification or engineering approval.

Can Kenta read scanned documents or use AI?

PDF originals can be viewed, and PDF equipment fields require human verification. Scanned pages require manual review; OCR and AI extraction are not available. Comparisons use fixed rules, and this document-review process does not send file contents to an AI model.

Does Kenta replace engineering review?

No. Qualified reviewers assess the applicable requirement and record their decisions. Kenta does not certify usable power capacity, approve equipment substitutions, guarantee commissioning readiness or authorize energization.

Is Kenta available for my project?

Request a demo to see Kenta with a sample project. Aurona will discuss your requirements and arrange evaluation access individually. Scope, supported files and data handling are agreed before customer documents are used.

Aurona Software / Kenta

See Kenta in action.

Explore Kenta with a sample project and discuss your team’s requirements.

Request a Demo

Website feedback

Your experience helps us improve.

Step 1 of 3

How easy was it to find what you needed?

Privacy notice
Call SalesRequest a demo

Ask Aurona

AI assistant

How can we help?

I’m Aurona’s AI assistant. I can help with products, applications and sourcing questions.

0/2000 characters

Need help getting started?